PUBLIC DISPLAY OF ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED NOPL – INDORAMA GAS PIPELINE TIE-IN PROJECT IN OYIGBO LOCAL GOVERNMENT AREA, RIVERS STATE BY TOTAL E&P NIGERIA LIMITED.

In accordance with the provisions of the Environmental Impact Assessment (EIA) Act Cap E12 LFN 2004, which makes it mandatory for proponents of all new major development activities to carry out Environmental Impact Assessment (EIA) of their proposed projects, the Federal Ministry of Environment hereby announces a twenty–one (21) working days Public disclosure for information and comments on the Environmental Impact Assessment Document submitted by Total E&P Nigeria Limited.

Click to download the reportNOPL-Indorama Tie-in EIA

EIA Report Display Centers Are:

  • Oyigbo Local Government Council, Afam, Rivers State
  • Rivers State Ministry of the Environment Office, Port Harcourt, Rivers State.
  • Federal Ministry of Environment Office, Port Harcourt, Rivers State.
  • Federal Ministry of Environment, Environment House (Brown Building), Independence Way, Central Business District, Abuja-F.C.T.

Duration of Disclosure:  Date:  2nd – 30th September, 2020.                     Time: 8:00am – 4:00pm Daily.

Click to download the reportNOPL-Indorama Tie-in EIA

Brief Project Description:

The proposed project involves a tie-in to an existing TEPNG 24″ x 50Km carbon steel NOPL=OWAZA gas supply line at KP -35.5 location which is at a mid-point on the NOPL pipeline running between TEPNG facility in OWAZA, Abia State and Rumuji Gas plant in Rivers State. The tie-in to be done at KP- 35.5 is to link an 18″ x 83Km carbon steel pipeline buit by Indorama Eleme Fertiizer & Chemical Limited (IEFCL).

ALL COMMENTS SHOULD BE FORWARDED TO THE HON. MINISTER, FEDERAL MINISTRY OF ENVIRONMENT HEADQUARTERS, MABUCHI, ABUJA -F.C.T OR VIA MAIL eia@ead.gov.ng or info@ead.gov.ng

Click to download the reportNOPL-Indorama Tie-in EIA