FEDERAL MINISTRY OF ENVIRONMENT

PUBLIC DISPLAY 

PUBLIC DISPLAY EXERCISE ON EIA OF THE PROPOSED SOLAR HYBRID PROJECT  AT TAI SOLARIN FEDERAL UNIVERSITY OF EDUCATION (TASFUED), IJAGUN, IJEBU-ODE, ODOGBOLU LOCAL GOVERNMENT AREA, OGUN STATE BY RURAL ELECTRIFICATION AGENCY (REA).

In accordance with the provisions of the Environmental Impact Assessment (EIA) Act CAP E12 LFN 2004, which makes it mandatory for proponents of all new major developmental activities to carry out EIA for their proposed projects, the Federal Ministry of Environment hereby announces twenty–one (21) working days public display for the draft ESIA report submitted by Rural Electrification Agency (REA).

Proposed Solar Hybrid Project at TASFUED Ijebu-Ode University  

The proposed project shall involve the construction of a 1.2 MWp (DC) / 1.0 MW (AC) solar-hybrid photovoltaic power plant with lithium-ion battery energy storage on an 8.529-acre site near the main gate of the Tai Solarin Federal University of Education (TASFUED), Ijagun, Ijebu-Ode, Odogbolu Local Government Area, Ogun State.

Date of Disclosure: 16th October– 13th November, 2026

COMMENTS SHOULD BE FORWARDED TO THE HON. MINISTER, FEDERAL MINISTRY OF ENVIRONMENT HEADQUARTERS, MABUSHI, ABUJA FCT AND VIA info@ead.gov.ng 

SIGNED

PERMANENT SECRETARY

FOR: HONOURABLE MINISTER