FEDERAL MINISTRY OF ENVIRONMENT

PUBLIC DISPLAY EXERCISE ON THE ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE PROPOSED 315,000 LITRES PETROLEUM PRODUCTS FILLING STATION AT PLOT NO. 186, CADASTRAL ZONE F04 MPAPE DISTRICT, BWARI AREA COUNCIL, ABUJA FCT BY JRB OIL AND GAS LIMITED.JRB OIL & GAS LIMITED MPAPE PET. STATION DRAFT EIA REPORT

In accordance with the provisions of the Environmental Impact Assessment (EIA) Act CAP E12 LFN 2004, which makes it mandatory for proponents of all new major developmental activities to carry out EIA for their proposed projects, the Federal Ministry of Environment hereby announces twenty–one (21) working days public display for the draft EMP report submitted by Geofteda Ventures Nigeria Limited CLICK TO DOWNLOAD REPORT JRB OIL & GAS LIMITED MPAPE PET. STATION 

Brief Project DescriptionThe proposed project entails the development, construction, and operation of a 315,000-litre capacity petrol filling station at Plot No. 186, Cadastral Zone F04, Mpape District within the Abuja. The project is designed to provide retail storage and dispensing services for petroleum products to meet the increasing demand for fuel within the Mpape and surrounding communities

In line with the EIA Procedural guidelines, the Ministry conducted site verification exercise on the proposed project location and upon the completion of the EIA study, the proponent submitted to the Ministry a copy of draft EIA report via a letter dated 8th June, 2026.

CLICK TO DOWNLOAD REPORT JRB OIL & GAS LIMITED MPAPE PET. STATION 

Duration of Display: 

Date: 29th June – 27th July, 2026.          Time: 8:00am – 4:00pm Daily.

COMMENTS SHOULD BE FORWARDED TO THE HON. MINISTER, FEDERAL MINISTRY OF ENVIRONMENT HEADQUARTERS, MABUSHI, ABUJA FCT AND VIA info@ead.gov.ng ON OR BEFORE 3rd AUGUST 2026.

SIGNED

PERMANENT SECRETARY

FOR: HONOURABLE MINISTER