FEDERAL MINISTRY OF ENVIRONMENT
PUBLIC DISPLAY
PUBLIC DISPLAY EXERCISE ON EIA REPORT OF THE PROPOSED SOLAR HYBRID PROJECT IN ADEYEMI FEDERAL UNIVERSITY OF EDUCATION, ONDO WEST LGA, ONDO STATE BY RURAL ELECTRIFICATION AGENCY (REA).
In accordance with the provisions of the Environmental Impact Assessment (EIA) Act CAP E12 LFN 2004, which makes it mandatory for proponents of all new major developmental activities to carry out EIA for their proposed projects, the Federal Ministry of Environment hereby announces twenty–one (21) working days public display for the draft ESIA report submitted by Rural Electrification Agency (REA).
Draft Ondo ESIA Report Federal University of Education
The proposed project entails the installation of polycrystalline photovoltaic solar panel arrays, lithium-ion batteries and ancillary components such as MPPT inverters and step-up transformers, switchgear, substation, transmission line, to generate the rated power of 1200kWac for a peak power of 1,000kWdc within Adeyemi Federal University of Education, Ondo West LGA, Ondo State. By Rural Electrification Agency (REA).
Date of Disclosure: 18th September– 19th October, 2026
COMMENTS SHOULD BE FORWARDED TO THE HON. MINISTER, FEDERAL MINISTRY OF ENVIRONMENT HEADQUARTERS, MABUSHI, ABUJA FCT AND VIA info@ead.gov.ng
SIGNED
PERMANENT SECRETARY
FOR: HONOURABLE MINISTER